Tiles & walls

The tiles have been placed in most of the places (...)




 Walls are up...actual walls now!



Career Fair at ICE

Yesterday, I had a great afternoon at the Institute of Culinary Education (ICE) in Manhattan where I attended the Career Fair as an exhibitor / employer...I met fantastic people that were looking for a job and I'm pretty sure we will find a way to work with some of them. Thanks ICE for the opportunity!


Wednesday, September 14, 2011

Facade & sign

The sign from the Soccer Shop is finally down...
Still some work need to be done, it's in pretty bad condition at the moment but soon the new facade will be installed...can't wait! ;)



Tuesday, September 13, 2011

Oven

The oven is in!
It wasn't that easy, the main door had to be removed, then a wall frame had to be cut out, but thanks to everybody who helped, the oven is in! :)





Wednesday, September 7, 2011

Things move fast!
Walls are open for rough plumbing to be done, walls are being framed. The subfloor is almost ready for the tiles to be installed.... many activities going on!
Soon the oven should be delivered...to be continued

 future place of the oven
 future place of the walkin cooler
 upstairs, future office and lockers
 Ground floor, the soffit frame is in place, walls are open for the plumbing to be done and the subfloors are being installed...



Saturday, August 27, 2011

Walls started to be built






Counter, bakery walls etc.

Let's hope this storm is not gonna damage anything done so far! ;)

Monday, August 15, 2011

After the demo

That's how it looks like inside after the demo...looks much bigger!